Subjects

📘 operations management

Step-by-step solutions with LaTeX - clean, fast, and student-friendly.

Search Solutions

Economic Order Quantity 17A5C7
1. **Problem Statement:** John Equipment Company estimates carrying cost at 15% and ordering cost at 9 per order. Annual requirement is 48,000 units at 4 per unit. Find:
Inventory Definition
1. **Problem Statement:** What is inventory?
Annual Holding Cost
1. **Problem Statement:** Calculate the total annual holding cost for an auto parts warehouse that orders 220 units of an air filter with an annual holding cost of 1.50 per unit. 2
Lead Time Analysis
1. **Problem Statement:** Determine the value-added time, non-value-added time (categorized into wait and move), and the value-added ratio for an average stereo unit in a batch of
Lead Time Analysis
1. **Problem Statement:** Isaacson Dental Inc. has a manufacturing process with 4 steps and batch sizes of 50 units. We need to calculate value-added time, non-value-added time, to
Lead Time Calculation
1. **State the problem:** We need to calculate the value-added time, non-value-added time, total lead time, and value-added ratio for both the present and proposed production appro
Fab Efficiency Utilization
1. **State the problem:** We need to find the fab's efficiency rate and utilization rate given the monthly design capacity, effective capacity, and actual production. 2. **Formulas
Productivity Calculations
1. **State the problem:** Calculate single-factor productivity for rubber and OCLV Carbon, multi-factor productivity in dollars for last year, and the expected multi-factor product
Carpet Productivity
1. **Problem Statement:** Calculate productivity measures for Carl's Carpet Cleaning Company based on given data.
Carpet Productivity
1. **State the problem:** We need to calculate productivity measures for Carl's Carpet Cleaning Company based on the data for two months ago and last month.
Facility Location
1. **Problem Statement:** We have two sets of cost functions for four communities each, representing total cost as a function of quantity $x$. We need to plot cost curves, find bre
Linear Programming
1. The problem involves optimizing the location for Pizza Pronto's next distribution kitchen using an advanced linear programming model. 2. Linear programming is a method to achiev
Learning Curve
1. **Problem Statement:** Calculate average labour hours per unit for 1, 2, 4, and 8 units, total cumulative labour hours for 8 units, and total labour cost using an 80% learning c