Subjects

📘 engineering economics

Step-by-step solutions with LaTeX - clean, fast, and student-friendly.

Search Solutions

Eac Comparison B1C4Cf
1. **Problem Statement:** A firm must choose between two production systems A and B with given costs, lifespans, operating costs, and other expenses. We need to compute the Equival
Present Worth
1. **Problem Statement:** We have a maintenance project with an initial cost of $100,000 in Year 1, increasing by $15,000 each year. The MARR (minimum attractive rate of return) is
Profitability Index
1. **State the problem:** Calculate the profitability index (PI) and the modified benefit/cost (B/C) ratio for a wind turbine project with given cash flows, a MARR of 10%, and a pr
Cost Scaling Depreciation
1. **Problem 1c:** Find the 2000 purchased cost of a heat exchanger with 30 m² heating surface, given 1990 cost for 100 m² is 4200, purchased cost capacity exponent 0.6 for surface